![]() a u d i o c o n f u s i o n
N E W S T U D I O C O N S T R U C T I O N D I A R Y
dedicated and in memory of my dad Cliff Nelson, and my grandpa Carl Nelson
heres a list of people that helped me so far and i really appreciate it: jaspen nelson, clyphe nelson, selena nelson, nate dawson, tim dawson, theron debusk (framing), dick craker (consulting), don bennet (consulting), chris corwin (everything), doug berry (block work), sergio lepore (clouds), tim barnette (plumbing and etc.), wes (electrical pipe), doug edge (sand), john (sand), john sandstrom (consulting), hugo (leftover block work), andrew (plumbing), kieth (plumbing), joe seevers (contracting), marvin and jeremy mccardle (framing and electric), kyle smith (intern- insulation, drywall, cable and phone), chris stauber (drywall), brandon (drywall), matt higuera (drywall , pat higuera (desk), shallowpoint (drywall, window, and trim), ben, john, bernie (doors), jeremy (painting), taylor and anne (painting), otis francis (studio wiring), joe (soffit), jon (electrical), brice
this is how it looked
![]() day 1- excavation
![]() ![]() plumbing
![]() ![]() ![]() morning before slab is layed their were all kinds of quails basking in the dirt
![]() ![]() ![]() ![]() laying the slab
![]() ![]() ![]() ![]() ![]() day 1 of block laying (it took 4 weeks)
![]() ![]() we had to cut alot of the rebar to place it in the correct place i dont know whta those slab guys were thinking
![]() ![]() ![]() ![]() ![]() ![]() ![]() five layers high
![]() ![]() ![]() ![]() ![]() what good helpers
![]() ![]() ![]() me and tim filling all the cells with sand
![]() on top of the world
![]() ![]() ![]() filling the bond beams with concrete
![]() whoa! huge!
![]() chris corwin hard at work (thanks chris)
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() wooden ac returns
![]() ![]() ![]() ![]() ![]() ![]() chris with the first piece of drywall
![]() and me
![]() ![]() using the drywall lift
![]() chris corwin at work
![]() matika with chris in the background (shot from control room into live room)
![]() kyle hard at work
![]() matt higuera helping out
![]() chris kicking butt
![]() taylor, kyle, and john
![]() more butt kickin
![]() moving sheets
![]() ![]() brandon at work
![]() ![]() shallowpoint monkeys (andy, nick, josh, mike, and bud)
![]() mike putting up paper to protect wall from texture
![]() andy laying the first layer of mud
![]() bud churning the mud
![]() nick sanding
![]() josh and "the hopper"
![]() ![]() jon hanging the first light (woohoo!)
![]() ![]() ![]() chris painting the mural
![]() chris and owen
![]() selena painting
![]() making baffles
![]() saro putting the first piece of wood flooring down
![]() live rooms done!
![]() me taking a break
![]() me and chris
![]() control rooms done!
![]() control room windows in
![]() new desk me and pat built (thanks pat)
![]() after a year, tada!
![]() iso booth 8/16/06 (just couple more days and itll be done)
![]() thanks odie!
![]() thanks for your patience selena
|
||