heres a list of people that helped me so far and i really appreciate it: jaspen nelson, clyphe nelson, selena nelson, nate dawson, tim dawson, theron debusk (framing), dick craker (consulting), don bennet (consulting), chris corwin (everything), doug berry (block work), sergio lepore (clouds), tim barnette (plumbing and etc.), wes (electrical pipe), doug edge (sand), john (sand), john sandstrom (consulting), hugo (leftover block work), andrew (plumbing), kieth (plumbing), joe seevers (contracting), marvin and jeremy mccardle (framing and electric),   kyle smith (intern- insulation, drywall, cable and phone),  chris stauber (drywall), brandon (drywall), matt higuera (drywall , pat higuera (desk), shallowpoint (drywall, window, and trim), ben, john, bernie (doors), jeremy (painting), taylor and anne (painting), otis francis (studio wiring),  joe (soffit),  jon (electrical), brice

this is how it looked

day 1- excavation




plumbing



morning before slab is layed their were all kinds of quails basking in the dirt






laying the slab






day 1 of block laying (it took 4 weeks)

we had to cut alot of the rebar to place it in the correct place i dont know whta those slab guys were thinking







five layers high





what good helpers



me and tim filling all the cells with sand

on top of the world



filling the bond beams with concrete

whoa! huge!

chris corwin hard at work (thanks chris)


































wooden ac returns






chris with the first piece of drywall

and me


using the drywall lift

chris corwin at work

matika with chris in the background (shot from control room into live room)

kyle hard at work

matt higuera helping out

chris kicking butt

taylor, kyle, and john

more butt kickin

moving sheets


brandon at work



shallowpoint monkeys (andy, nick, josh, mike, and bud)

mike putting up paper to protect wall from texture

andy laying the first layer of mud

bud churning the mud

nick sanding

josh and "the hopper"


jon hanging the first light (woohoo!)



chris painting the mural

chris and owen

selena painting

making baffles

saro putting the first piece of wood flooring down

live rooms done!

me taking a break

me and chris

control rooms done!

control room windows in

new desk me and pat built (thanks pat)

after a year, tada!

iso booth 8/16/06 (just couple more days and itll be done)

thanks odie!

thanks for your patience selena


session photos